Monday, 7 October 2013

Monday, 7th October

Work in progress today - by lunchtime the ceilings had been painted, and some levelling has been done where needed, the shower tray has also had a levelling coat put on it.  

The wash basin and the taps are on in the en-suite shower room, and most of the doors have had their first hanging and are awaiting their catches, handles, etc. and the door the the kitchen has to be glazed, coming along......

The exterior is causing a few headaches, but hopefully the problems will be solved soon, and the bags of render will be on the walls before too long.

Nice to see that the lights are now working, and we can go to the loo at night without using a torch!