SEPTEMBER - up to 6th...........

A busy week, things going on, boiler room plastered, bedroom two in process of being fitted out, drains finished/repaired, gas man coming tomorrow (I think), last parts of framing for the Renderlath going up.  

We have ordered a wood burning stove - Barbas Unilux-30 from http://www.bonkandco.co.uk/, will get our brickie to restore the chimney.

Waiting for the Rockwool wall to be done properly, as the installers omitted seals between metal work, and installed without any DPC, etc.

Very random order, but I hope you get the idea. 

  DRAINS




dribbling drain - now repaired and cemented in as above


   BATHROOMS


When digging out for the gas pipe came across the rain water drain which had a hole in it, which may account for the occasional smell - now repaired and waiting for the gas pipe to be put in, maybe tomorrow.


Why do floors do such things, it was fine for a week, and then exploded
 
now repaired
 




boiler room plastered

chimney/fireplace

battening out for insulation and then render