In the meantime, this is where we are at, plaster up in en-suite, and pipework for the shower, plaster finished in kitchen, boiler room, and pantry, all insulation up on outside walls, trench dug for gas supply from meter.
A few pics, and see you all in a couple of weeks.......
2nd bedroom, plumbing through wall to en suite |
second bedroom plasterboarded |
en suite plastered |
gas pipe |
wall where kitchen sink will go |