Wednesday, 3 July 2013

3rd July big windows out and one back in........

Sorry I have not been doing a daily blog, but been away and busy yesterday, and not a lot of photos to show.  However, yesterday John and Neil took out one of the big garden windows and the side door to the sitting room, and got it back in again.

Today the second window has come out, the side wall has been removed, and the Marley tiles that formed the original floor covering in that area and had the wall built onto them have been removed.  The brickwork has been stabilised and all is ready for the window to go back after lunch beak.

Insulation that ended where the old roof had been cut back has been inserted, the main beams over windows have had 6" nails through into the joists, as they were only held in by nail gun nails, and not through into the joists.  The joist hangers have had the correct nails put into them and in all the holes.........

So lots of busyness today and yesterday and it really feels like we are moving towards the finish.

Space where old roof cut back but insulation not inserted


the original 6" nails that came through the roof, but not secured to anything
Insulation now going in and the beam secured to the cross beams

the door back in situ

insulation put in

insulation completed to roof