No sign of the Completion Certificate yet.
But watch this space. Will be a celebration when it comes.
The daily events of the extension and refurbishment of a small mid-20th Century modernist house in East Lothian
Friday, 31 July 2015
Wednesday, 1 July 2015
Still Waiting for Completion Certificate
Have been having some problems with the computer and pictures, so no posts for a while.
We are still waiting for the Completion Certificate, having had the corrected drawings done. All in due course!!!
In the meantime we have been away and have come back and started on the raised beds, which hopefully will be productive fairly soon.
We have also bought some new rugs, a small kelim for the hall (not much space for opening doors over a rug) and a larger greenish Gabbeh, which is wool, but is not vegetable dyed as this fades with the strong sunlight. All nice and cosy for the winter!
We have also dug in the cable for the electrics to the garage and studio.
All pictures self explanatory, I think.
We are still waiting for the Completion Certificate, having had the corrected drawings done. All in due course!!!
In the meantime we have been away and have come back and started on the raised beds, which hopefully will be productive fairly soon.
We have also bought some new rugs, a small kelim for the hall (not much space for opening doors over a rug) and a larger greenish Gabbeh, which is wool, but is not vegetable dyed as this fades with the strong sunlight. All nice and cosy for the winter!
We have also dug in the cable for the electrics to the garage and studio.
All pictures self explanatory, I think.
Subscribe to:
Posts (Atom)